CONCRETE
Preparation and application procedure
CONCRETE SLABS |
PREPARATION |
---|
Procedure:
Notes:
|
FINISH COATING |
After reparing the surface…
Procedure:
|
SEALANT |
After preparing the surface and applying the coating (if necessary)
Procedure:
Notes:
|
MAINTENANCE:
Clean the surface with Texnov Surface Preparer (3 water/ 1 preparer). Let dry and add a coat of Texnov Met-30 or Texnov Met-HD Sealant every 3 years or as needed, which should enable you to keep your surface in good condition. |
CONCRETE GARAGE FLOOR |
PREPARATION |
---|
Procedure:
|
FINISH COATING |
After preparing the surface…
Procedure:
|
SEALANT |
After preparing the surface and applying the coating (if neccessary)…
Procedure:
|
MAINTENANCE:
Clean the surface with Texnov Surface Preparer (3 water/ 1 preparer). Let dry and add a coat of Texnov Met-HD Sealant every 3 years or as needed, which should enable you to keep your surface in good condition. |
CONCRETE FOUNDATION |
PREPARATION |
---|
Procedure:
Notes:
|
FINISH COATING |
After preparing surface…
Procedure:
|
SEALANT |
The sealant is not needded for a concrete foundation surface. |
MAINTENANCE:
Clean the surface with Texnov Surface Preparer (3 water / 1 preparer) |
FRESHLY POURED CONCRETE |
PREPARATION |
---|
Not applicable |
FINISH COATING |
Not applicable |
SEALANT |
For a freshly poured concrete floor done on the same day.
Procedure:
|